ACTUAL PLAN. ACTUAL WIP. CONDITIONAL FORECAST.
Production Plan & WIP
Your MES data, reflected in a separate 3D workspace.
3D production comparison
Loading the selected work order…
Recorded WIP identity is loading.
Only remaining parts are shown. Replay time is compressed; operation order, downtime and the MES calendar stay unchanged.
Forecasts follow the MES working calendar. Downtime is shown with hatching.
Parts and machine paths are schematic. Animation is a projection, not live machine motion.
Routing completion and target risk
Setup and reservation checks
Loading reservation checks…
—
What-if projection only. Saved MES plans, reservations and WIP are never changed. Unscheduled WOs, physical setup completion and future quality outcomes remain conditional.
—
What this forecast depends on
Calculation and read-only connection details
Production Plan, issued WO, frozen routing, WIP and result evidence are read from the existing MES. The separate bridge uses read-only database transactions and sends a sanitized snapshot to the separate sample every 30 seconds while the PC bridge is running.
Unfinished operations use registered equipment capacity, efficiency, units per cycle and explicit parallel units. Work follows the line calendar, holidays and breaks. Selected equipment cooperate in each operation; shared equipment cannot process two projected tasks at once.
The current operation is treated as a full remaining cycle because the MES does not provide operation-start progress telemetry. All required setup is completed serially before production, matching MES reservation arithmetic. Setup reuse is inferred when prior WO/operation results exist. Later results are assumed OK. Material availability and entry of not-yet-entered units are assumptions.
HOLD, EJECT_PENDING, held LOTs and inconsistent result evidence block a complete ETA. Ejected units do not become replacement units. Saved PLANNED reservations block the full line and shared equipment, including non-working gaps. Other unscheduled WOs remain a source of uncertainty.
A plan-date target is an end-of-day reference, not a confirmed customer delivery deadline. Routing completion does not imply FQC/OQC approval, stock receipt, shipment or WO closure. Original plans, reservations, WIP and results are never changed. RUNNING WOs are not rescheduled through the MES API.
The 3D layout uses actual routing order and assigned equipment IDs. Geometry, transfers and robot paths are illustrative; equipment registry status is not a live PLC signal.