ACTUAL PLAN. ACTUAL WIP. CONDITIONAL FORECAST.

Production Plan & WIP

Your MES data, reflected in a separate 3D workspace.

Connecting to MES feed…Waiting for the first snapshot
LINE & FROZEN ROUTE——
ACTUAL WIP · 3D REPLAY

3D production comparison

—

Loading the selected work order…

ACTUAL MES · READ ONLYReading MES identity…MES mapping & time rules ↗
NORMAL · NO ADDED STOP——
30 MIN EQUIPMENT STOP——
ADDITIONAL COMPLETION DELAY—Same snapshot · Same remaining work
Normal flow → Stop & wait → Restart → Finish—
1 · Moving2 · Stop & wait3 · Resume4 · Finish
CAMERA TARGET
Part B · Stop scenarioClick to release follow and inspect · Use Follow to track the selected part

Recorded WIP identity is loading.

Only remaining parts are shown. Replay time is compressed; operation order, downtime and the MES calendar stay unchanged.

Recorded WIP / projected outputAssumed new entryEquipment stopMaterial flow →
SAME START · TWO COMPLETION TIMES—
Normal
—
Stop scenario
—

Forecasts follow the MES working calendar. Downtime is shown with hatching.

Drag to move sideways · Wheel to zoom
PROJECTION CLOCK—
Normal —Stop scenario —

Parts and machine paths are schematic. Animation is a projection, not live machine motion.

PREDICTIVE

Routing completion and target risk

—
CURRENT-WIP BASELINE · NO STOP——
EQUIPMENT-STOP SCENARIO——
ADDITIONAL COMPLETION DELAY——
——
MES SCHEDULING RULES

Setup and reservation checks

WAITING FOR FEED
NORMAL PROJECTED START—
STOP SCENARIO START—
UPFRONT SETUP—
RESERVATION COVERAGE—
RESERVATIONS AVOIDED—
START WAIT FROM REQUEST—

Loading reservation checks…

—

What-if projection only. Saved MES plans, reservations and WIP are never changed. Unscheduled WOs, physical setup completion and future quality outcomes remain conditional.

SELECTED OPERATION

—

—
FROZEN EQUIPMENT—
REGISTERED EFFECTIVE CYCLE—
ACTUAL WIP AT THIS SEQUENCE—
EQUIPMENT REGISTRY STATUS—
DATA QUALITY & MODEL BOUNDARIES

What this forecast depends on

CONDITIONAL
Calculation and read-only connection details

Production Plan, issued WO, frozen routing, WIP and result evidence are read from the existing MES. The separate bridge uses read-only database transactions and sends a sanitized snapshot to the separate sample every 30 seconds while the PC bridge is running.

Unfinished operations use registered equipment capacity, efficiency, units per cycle and explicit parallel units. Work follows the line calendar, holidays and breaks. Selected equipment cooperate in each operation; shared equipment cannot process two projected tasks at once.

The current operation is treated as a full remaining cycle because the MES does not provide operation-start progress telemetry. All required setup is completed serially before production, matching MES reservation arithmetic. Setup reuse is inferred when prior WO/operation results exist. Later results are assumed OK. Material availability and entry of not-yet-entered units are assumptions.

HOLD, EJECT_PENDING, held LOTs and inconsistent result evidence block a complete ETA. Ejected units do not become replacement units. Saved PLANNED reservations block the full line and shared equipment, including non-working gaps. Other unscheduled WOs remain a source of uncertainty.

A plan-date target is an end-of-day reference, not a confirmed customer delivery deadline. Routing completion does not imply FQC/OQC approval, stock receipt, shipment or WO closure. Original plans, reservations, WIP and results are never changed. RUNNING WOs are not rescheduled through the MES API.

The 3D layout uses actual routing order and assigned equipment IDs. Geometry, transfers and robot paths are illustrative; equipment registry status is not a live PLC signal.